Skip to main content

PROJECT INITIATION AND FACILITATION PTY. LTD.

ABN cancelledABN cancelled from 29 Jan 2021

Australian private company · last location VIC 3141

ABN cancelled
ABN
78 152 675 897Cancelled from 29 Jan 2021
GST
Not registered
Last location
VIC 3141Main business location

Registration

Legal name
PROJECT INITIATION AND FACILITATION PTY. LTD.
ABN
78 152 675 897 Cancelled from 29 Jan 2021
Entity type
Australian Private Company
GST
Not registered
DGR
Not endorsed
Last main business location
VIC 3141

Patents (28)

No current patents.

No longer current (28)
TitleStatusFiled
Innovative Methodology used on Projects for the procurement of concrete-structured residential-type buildings designed with greater than six habitable floors and with the preferred total height of such buildings measured over their habitable floors being no more than 3 and a third times the number of habitable storeys that would otherwise be allowed On projects complying with these characteristics the Innovative Methodology allows the introduction of at least one extra habitable floor levelNo. 2022901107 · ProvisionalLapsed2 Jun 202327 Apr 2022
An innovative configuration that is composed of two heights of permanent formwork and steel reinforcement for two concrete columns that are installed one on top of the otherNo. 2022900333 · ProvisionalLapsed5 May 202316 Feb 2022
The use of a simple yet innovative methodology to measure the tonnage of sand being deposited at any time from a vessel used to transport a slurry of seawater or river water and sand after such a slurry has been extracted for the purposes of land reclamationNo. 2022900093 · ProvisionalLapsed3 Mar 202319 Jan 2022
An invention that in contrast to any preceding claim has the dual purpose of combining the assembly and use of Autoclaved Aerated Concrete permanent panel formwork shells used as moulds for the construction of rectangular including square concrete columns with the provision of a standard of surface finish for the external faces of said columns that achieves the basic requirement for complying with the specified final surface finishNo. 2021903822 · ProvisionalLapsed6 Jan 202326 Nov 2021
A methodology for installing permanent formwork for concrete columns by using Autoclaved Aerated Concrete Panels thin enough to match the size of the concrete coverNo. 2021902529 · ProvisionalLapsed7 Oct 202213 Aug 2021
Permanent Broad Column FormworkNo. 2021901452 · ProvisionalLapsed1 Jul 202215 May 2021
A methodology to reduce time it takes on-site to install other types of concrete columns rather than precast columns or tubular columns using a pour down approach To achieve this a transporter system is used by which Permanent Works for columns are conveyed into their final installation positioning by Temporary Works and other equipment The column reinforcement cage and formwork comprise the Permanent Works Soldiers walers and standard-type falsework comprise the Temporary Works The other equipmNo. 2020904067 · ProvisionalLapsed7 Jan 20227 Nov 2020
An invention that is one that takes the innovative step of applying a single methodology which has the dual purpose of combining the manufacture assembly and use of permanent formwork shells made of either Villaboard or Naxan Universal Performance Board UPB used as moulds for the construction of rectangular including square concrete columns with the provision of a standard of surface finish for the external faces of said columns that achieves the basis for complying with the specified final surfNo. 2020903829 · ProvisionalLapsed3 Dec 202122 Oct 2020
The Resource Flow Method is an innovative methodology by which construction programs are developed with the Prime Objective of achieving a stipulated separation distance between different trades Fulfilling this Objective reduces congestion at the work face and thereby minimises infection by a contagious disease In order to achieve that Objective the methodology expands the amount of information available to define monitor and control construction strategy beyond the usual delineation of the requNo. 2020902823 · ProvisionalLapsed1 Oct 202110 Aug 2020
Adoption of an innovative methodology that uses readily available parts of construction false-work systems for the assembly of a Column Frame-work and which as a result provides opportunities to fulfil the following three overall Objectives Reducing the use of crane hook-time Saving a working-day per structural cycle and Enabling a healthier and less congested workplace to be achievedNo. 2020901337 · ProvisionalLapsed4 Jun 202128 Apr 2020
An innovative methodology that minimises the amount of crane hook-time required to install pre-fabricated column-forms on multi-storey building development projects by using a column transportation frame which also serves as false-work supporting the soffit form-work for the concrete slab aboveNo. 2020900995 · ProvisionalLapsed7 May 202131 Mar 2020
A shell consisting of four vertical panels made from Magnesium Oxide board in contrast to steel sheeting having four internal faces which when assembled and appropriately restrained define a moulding cavity open towards an upper and a lower end and thereby provide permanent formwork for rectangular including square concrete columns and four external faces which when suitably jointed stopped and sanded are capable of becoming the basis of a standard of surface finish that complies with even the hNo. 2020900784 · ProvisionalLapsed7 May 202115 Mar 2020
An innovative methodology undertaken during the process of constructing a reinforced concrete building which allows Table-form false-work to be transported across a recently poured concrete slab on the second calendar day after that particular pour had been undertaken The methodology is specifically applicable to that type of Table-Form false-work which is assembled using Table-Heads into which the top plates of its props can be so securely locked that said props do not require to have any crossNo. 2019904251 · ProvisionalLapsed14 Dec 202011 Nov 2019
AN INNOVATIVE METHODOLOGY THAT PROVIDES THE ABILITY ON BUILDING DEVELOPMENTS CONSTRUCTED WITH REINFORCED CONCRETE STRUCTURES FOR SEVERAL PREFABRICATED BATHROOM MODULES TO BE LIFTED AT A TIME AND TO BE INSTALLED ON SAME WORKING DAY AS IS COMMONLY SCHEDULED FOR POURING CONCRETE COLUMNSNo. 2019904056 · ProvisionalLapsed4 Dec 202028 Oct 2019
An innovative methodology during concrete construction allowing a prefabricated bathroom module to be installed the next working day after pouring a concrete floor-slab and which has three inherent attributes Firstly that module has been fabricated with a frame-work strong enough to act as slab false-work secondly the modules roof secures form-work acting as the mould for the set down of the concrete slab supporting the module above and thirdly a jacking system to raise and lower the module so tNo. 2019903162 · ProvisionalLapsed2 Oct 202029 Aug 2019
An innovative methodology using the invention of transporter frame as a new type of site-based equipment that allows a crane to unload a pre-fabricated wall thats part of the construction of a new building immediately after lifting it onto the level required without that crane being required thereafter to hold that wall aloft until its final fixing has been completed Instead of the crane it is the transporter frames moved and manoeuvred by an electric powered tug that are used in conveying suppoNo. 2019901365 · ProvisionalLapsed5 Jun 202019 Apr 2019
Permanent slab soffit formwork made from suitable mineral boards having an upper face providing a permanent formwork for a reinforced concrete slab a structural capability to fix inserts in the slab such as building services housings and conduits Thereby eliminating the need for a ceiling suspension system and permitting storey heights to be reduced and a lower face providing a high quality ceiling surface finish After falsework removal this eliminates the need for trades involved in either rendNo. 2018902412 · ProvisionalLapsed6 Sep 20193 Jul 2018
A column shell consisting of four vertical panels made from magnesium mineral board having - four internal faces which when assembled and restrained by formwork clamps or internal stud system define a moulding cavity open towards an upper and a lower end and thereby provide permanent formwork for rectangular including square concrete columns and - four external faces which when suitably jointed stopped and sanded are capable of becoming the basis of a standard of surface finish that complies witNo. 2018902043 · ProvisionalLapsed2 Aug 20196 Jun 2018
The innovative step in a methodology is that the two different types of walling system are transported into place by being attached to the table-forms and the inventive step in a methodology is a system that enables the table-forms to be removed easily when the required concrete strength in the slab has been reached and in a manner that allows at least a 50mm clearance to each of the external surfaces of the side-walls as well as a 50mm clearance not only to the soffit of the slab above but alsoNo. 2017904953 · ProvisionalLapsed1 Feb 20199 Dec 2017
The Multi-Conditioning Unit is fitted in the ceilings of buildings and has the capabilities of removing all odours dehumidifying the air using induction eliminating mould and viruses in the air heating and air-conditioning With all these capabilities installed within the same device In addition the Unit uses less energy than other conditioning units and it is sufficiently compact and light in weight to be easily fitted into volumetric room pods that are manufactured off-siteNo. 2017904219 · ProvisionalLapsed7 Dec 201818 Oct 2017
A methodology during the process of constructing a reinforced concrete building which allows prefabricated volumetric bathroom modules to be installed on the level of the latest slab pour on the same working day upon which the pouring of columns and erection of slab falsework is commenced for construction of the concrete structure above that particular slab pourNo. 2017903344 · ProvisionalLapsed5 Oct 201818 Aug 2017
A methodology by which no pilot escort vehicle is required when transporting prefabricated volumetric room modules that in their final installation configuration have dimensions that are within the limits of being 42 metres wide at least 39 metres long and at most 40 metres highNo. 2017902987 · ProvisionalLapsed7 Sep 201828 Jul 2017
Use of Magnesium Oxide Board as formwork for the vertical faces of moulding cavities for concrete beams when the structural design proposes a band-beam and metal-tray formed slab structural systemNo. 2016902851 · ProvisionalLapsed1 Sep 201720 Jul 2016
A column shell consisting of four vertical panels made from magnesium oxide board having four internal faces which when assembled and substantially restrained by special external column formwork clamps define a moulding cavity open towards an upper and a lower end and thereby provide permanent formwork for rectangular including square concrete columns and four external faces which when suitably jointed stopped and sanded are capable of becoming the basis of a standard of surface finish that compNo. 2016901237 · ProvisionalLapsed5 May 20174 Apr 2016
Magnesium Oxide Board or other similar non-toxic types of sheeting with equal or greater environmental sustainability levels of resistance to fire water and impact and with equal or greater thermal sound mould and termite levels of protection is used for the panels of the permanent formwork for the vertical faces of concrete beams that are securely fixed to metal-tray formwork sheets off-site and ahead of schedule in order to create a pre-fabricated product Such a product allows both of these stNo. 2015902916 · ProvisionalLapsed2 Sep 201622 Jul 2015
An innovative methodology for constructing suspended slabs which has all the following characteristics all table-form tops are assembled off-site together with o most of the moulds for shaping the concrete o all of the void formers if any o most of the inserts including cables o most of the reinforcement the Pre-formed Panels do not incorporate any pre-casting They are stacked a maximum of 4 delivered to site lifted by crane and then have props fixed riggers then move the Pre-formed Panels in plNo. 2014904304 · ProvisionalLapsed4 Dec 201528 Oct 2014
An innovation using Magnesium Oxide MgO Board as formwork for the vertical faces for concrete beams Its preferred embodiment reduces greenhouse gas emissions in the use of precast beam-shells by the adoption of MgO Board for vertical faces Greenhouse gas emissions are reduced because MgO Board is a material that uniquely complies with the three environmental pre-requisites of Sequestering carbon dioxide during its formation Being totally renewable by recycling and Remaining totally carbon-neutraNo. 2014900633 · ProvisionalLapsed3 Apr 201526 Feb 2014
A column shell consisting of four vertical panels made from magnesium oxide board having four internal faces which when assembled and substantially restrained by external column formwork clamps define a moulding cavity open towards an upper and a lower end and thereby provide permanent formwork for rectangular including square concrete columns and four external faces which when suitably jointed stopped and sanded are capable of becoming the basis of a standard of surface finish that complies witNo. 2013902488 · ProvisionalLapsed5 Sep 20145 Jul 2013

Current means registered, granted or still being examined. Applications are listed by filing date, newest first.

History

  1. 29 Jan 2021
    ABN cancelledABR

We record changes every week from 20 Nov 2026. Earlier dates come from each register.

Related

Also in postcode 3141

All businesses in postcode 3141 →

Similar names (not necessarily related)