PROJECT INITIATION AND FACILITATION PTY. LTD.
ABN cancelledABN cancelled from 29 Jan 2021
Australian private company · last location VIC 3141
ABN cancelled
- ABN
- 78 152 675 897Cancelled from 29 Jan 2021
- GST
- Not registered
- Last location
- VIC 3141Main business location
Registration
- Legal name
- PROJECT INITIATION AND FACILITATION PTY. LTD.
- ABN
- 78 152 675 897 Cancelled from 29 Jan 2021
- Entity type
- Australian Private Company
- GST
- Not registered
- DGR
- Not endorsed
- Last main business location
- VIC 3141
Patents (28)
No current patents.
No longer current (28)
| Title | Status | Filed |
|---|---|---|
| Innovative Methodology used on Projects for the procurement of concrete-structured residential-type buildings designed with greater than six habitable floors and with the preferred total height of such buildings measured over their habitable floors being no more than 3 and a third times the number of habitable storeys that would otherwise be allowed On projects complying with these characteristics the Innovative Methodology allows the introduction of at least one extra habitable floor levelNo. 2022901107 · Provisional | Lapsed2 Jun 2023 | 27 Apr 2022 |
| An innovative configuration that is composed of two heights of permanent formwork and steel reinforcement for two concrete columns that are installed one on top of the otherNo. 2022900333 · Provisional | Lapsed5 May 2023 | 16 Feb 2022 |
| The use of a simple yet innovative methodology to measure the tonnage of sand being deposited at any time from a vessel used to transport a slurry of seawater or river water and sand after such a slurry has been extracted for the purposes of land reclamationNo. 2022900093 · Provisional | Lapsed3 Mar 2023 | 19 Jan 2022 |
| An invention that in contrast to any preceding claim has the dual purpose of combining the assembly and use of Autoclaved Aerated Concrete permanent panel formwork shells used as moulds for the construction of rectangular including square concrete columns with the provision of a standard of surface finish for the external faces of said columns that achieves the basic requirement for complying with the specified final surface finishNo. 2021903822 · Provisional | Lapsed6 Jan 2023 | 26 Nov 2021 |
| A methodology for installing permanent formwork for concrete columns by using Autoclaved Aerated Concrete Panels thin enough to match the size of the concrete coverNo. 2021902529 · Provisional | Lapsed7 Oct 2022 | 13 Aug 2021 |
| Permanent Broad Column FormworkNo. 2021901452 · Provisional | Lapsed1 Jul 2022 | 15 May 2021 |
| A methodology to reduce time it takes on-site to install other types of concrete columns rather than precast columns or tubular columns using a pour down approach To achieve this a transporter system is used by which Permanent Works for columns are conveyed into their final installation positioning by Temporary Works and other equipment The column reinforcement cage and formwork comprise the Permanent Works Soldiers walers and standard-type falsework comprise the Temporary Works The other equipmNo. 2020904067 · Provisional | Lapsed7 Jan 2022 | 7 Nov 2020 |
| An invention that is one that takes the innovative step of applying a single methodology which has the dual purpose of combining the manufacture assembly and use of permanent formwork shells made of either Villaboard or Naxan Universal Performance Board UPB used as moulds for the construction of rectangular including square concrete columns with the provision of a standard of surface finish for the external faces of said columns that achieves the basis for complying with the specified final surfNo. 2020903829 · Provisional | Lapsed3 Dec 2021 | 22 Oct 2020 |
| The Resource Flow Method is an innovative methodology by which construction programs are developed with the Prime Objective of achieving a stipulated separation distance between different trades Fulfilling this Objective reduces congestion at the work face and thereby minimises infection by a contagious disease In order to achieve that Objective the methodology expands the amount of information available to define monitor and control construction strategy beyond the usual delineation of the requNo. 2020902823 · Provisional | Lapsed1 Oct 2021 | 10 Aug 2020 |
| Adoption of an innovative methodology that uses readily available parts of construction false-work systems for the assembly of a Column Frame-work and which as a result provides opportunities to fulfil the following three overall Objectives Reducing the use of crane hook-time Saving a working-day per structural cycle and Enabling a healthier and less congested workplace to be achievedNo. 2020901337 · Provisional | Lapsed4 Jun 2021 | 28 Apr 2020 |
| An innovative methodology that minimises the amount of crane hook-time required to install pre-fabricated column-forms on multi-storey building development projects by using a column transportation frame which also serves as false-work supporting the soffit form-work for the concrete slab aboveNo. 2020900995 · Provisional | Lapsed7 May 2021 | 31 Mar 2020 |
| A shell consisting of four vertical panels made from Magnesium Oxide board in contrast to steel sheeting having four internal faces which when assembled and appropriately restrained define a moulding cavity open towards an upper and a lower end and thereby provide permanent formwork for rectangular including square concrete columns and four external faces which when suitably jointed stopped and sanded are capable of becoming the basis of a standard of surface finish that complies with even the hNo. 2020900784 · Provisional | Lapsed7 May 2021 | 15 Mar 2020 |
| An innovative methodology undertaken during the process of constructing a reinforced concrete building which allows Table-form false-work to be transported across a recently poured concrete slab on the second calendar day after that particular pour had been undertaken The methodology is specifically applicable to that type of Table-Form false-work which is assembled using Table-Heads into which the top plates of its props can be so securely locked that said props do not require to have any crossNo. 2019904251 · Provisional | Lapsed14 Dec 2020 | 11 Nov 2019 |
| AN INNOVATIVE METHODOLOGY THAT PROVIDES THE ABILITY ON BUILDING DEVELOPMENTS CONSTRUCTED WITH REINFORCED CONCRETE STRUCTURES FOR SEVERAL PREFABRICATED BATHROOM MODULES TO BE LIFTED AT A TIME AND TO BE INSTALLED ON SAME WORKING DAY AS IS COMMONLY SCHEDULED FOR POURING CONCRETE COLUMNSNo. 2019904056 · Provisional | Lapsed4 Dec 2020 | 28 Oct 2019 |
| An innovative methodology during concrete construction allowing a prefabricated bathroom module to be installed the next working day after pouring a concrete floor-slab and which has three inherent attributes Firstly that module has been fabricated with a frame-work strong enough to act as slab false-work secondly the modules roof secures form-work acting as the mould for the set down of the concrete slab supporting the module above and thirdly a jacking system to raise and lower the module so tNo. 2019903162 · Provisional | Lapsed2 Oct 2020 | 29 Aug 2019 |
| An innovative methodology using the invention of transporter frame as a new type of site-based equipment that allows a crane to unload a pre-fabricated wall thats part of the construction of a new building immediately after lifting it onto the level required without that crane being required thereafter to hold that wall aloft until its final fixing has been completed Instead of the crane it is the transporter frames moved and manoeuvred by an electric powered tug that are used in conveying suppoNo. 2019901365 · Provisional | Lapsed5 Jun 2020 | 19 Apr 2019 |
| Permanent slab soffit formwork made from suitable mineral boards having an upper face providing a permanent formwork for a reinforced concrete slab a structural capability to fix inserts in the slab such as building services housings and conduits Thereby eliminating the need for a ceiling suspension system and permitting storey heights to be reduced and a lower face providing a high quality ceiling surface finish After falsework removal this eliminates the need for trades involved in either rendNo. 2018902412 · Provisional | Lapsed6 Sep 2019 | 3 Jul 2018 |
| A column shell consisting of four vertical panels made from magnesium mineral board having - four internal faces which when assembled and restrained by formwork clamps or internal stud system define a moulding cavity open towards an upper and a lower end and thereby provide permanent formwork for rectangular including square concrete columns and - four external faces which when suitably jointed stopped and sanded are capable of becoming the basis of a standard of surface finish that complies witNo. 2018902043 · Provisional | Lapsed2 Aug 2019 | 6 Jun 2018 |
| The innovative step in a methodology is that the two different types of walling system are transported into place by being attached to the table-forms and the inventive step in a methodology is a system that enables the table-forms to be removed easily when the required concrete strength in the slab has been reached and in a manner that allows at least a 50mm clearance to each of the external surfaces of the side-walls as well as a 50mm clearance not only to the soffit of the slab above but alsoNo. 2017904953 · Provisional | Lapsed1 Feb 2019 | 9 Dec 2017 |
| The Multi-Conditioning Unit is fitted in the ceilings of buildings and has the capabilities of removing all odours dehumidifying the air using induction eliminating mould and viruses in the air heating and air-conditioning With all these capabilities installed within the same device In addition the Unit uses less energy than other conditioning units and it is sufficiently compact and light in weight to be easily fitted into volumetric room pods that are manufactured off-siteNo. 2017904219 · Provisional | Lapsed7 Dec 2018 | 18 Oct 2017 |
| A methodology during the process of constructing a reinforced concrete building which allows prefabricated volumetric bathroom modules to be installed on the level of the latest slab pour on the same working day upon which the pouring of columns and erection of slab falsework is commenced for construction of the concrete structure above that particular slab pourNo. 2017903344 · Provisional | Lapsed5 Oct 2018 | 18 Aug 2017 |
| A methodology by which no pilot escort vehicle is required when transporting prefabricated volumetric room modules that in their final installation configuration have dimensions that are within the limits of being 42 metres wide at least 39 metres long and at most 40 metres highNo. 2017902987 · Provisional | Lapsed7 Sep 2018 | 28 Jul 2017 |
| Use of Magnesium Oxide Board as formwork for the vertical faces of moulding cavities for concrete beams when the structural design proposes a band-beam and metal-tray formed slab structural systemNo. 2016902851 · Provisional | Lapsed1 Sep 2017 | 20 Jul 2016 |
| A column shell consisting of four vertical panels made from magnesium oxide board having four internal faces which when assembled and substantially restrained by special external column formwork clamps define a moulding cavity open towards an upper and a lower end and thereby provide permanent formwork for rectangular including square concrete columns and four external faces which when suitably jointed stopped and sanded are capable of becoming the basis of a standard of surface finish that compNo. 2016901237 · Provisional | Lapsed5 May 2017 | 4 Apr 2016 |
| Magnesium Oxide Board or other similar non-toxic types of sheeting with equal or greater environmental sustainability levels of resistance to fire water and impact and with equal or greater thermal sound mould and termite levels of protection is used for the panels of the permanent formwork for the vertical faces of concrete beams that are securely fixed to metal-tray formwork sheets off-site and ahead of schedule in order to create a pre-fabricated product Such a product allows both of these stNo. 2015902916 · Provisional | Lapsed2 Sep 2016 | 22 Jul 2015 |
| An innovative methodology for constructing suspended slabs which has all the following characteristics all table-form tops are assembled off-site together with o most of the moulds for shaping the concrete o all of the void formers if any o most of the inserts including cables o most of the reinforcement the Pre-formed Panels do not incorporate any pre-casting They are stacked a maximum of 4 delivered to site lifted by crane and then have props fixed riggers then move the Pre-formed Panels in plNo. 2014904304 · Provisional | Lapsed4 Dec 2015 | 28 Oct 2014 |
| An innovation using Magnesium Oxide MgO Board as formwork for the vertical faces for concrete beams Its preferred embodiment reduces greenhouse gas emissions in the use of precast beam-shells by the adoption of MgO Board for vertical faces Greenhouse gas emissions are reduced because MgO Board is a material that uniquely complies with the three environmental pre-requisites of Sequestering carbon dioxide during its formation Being totally renewable by recycling and Remaining totally carbon-neutraNo. 2014900633 · Provisional | Lapsed3 Apr 2015 | 26 Feb 2014 |
| A column shell consisting of four vertical panels made from magnesium oxide board having four internal faces which when assembled and substantially restrained by external column formwork clamps define a moulding cavity open towards an upper and a lower end and thereby provide permanent formwork for rectangular including square concrete columns and four external faces which when suitably jointed stopped and sanded are capable of becoming the basis of a standard of surface finish that complies witNo. 2013902488 · Provisional | Lapsed5 Sep 2014 | 5 Jul 2013 |
Current means registered, granted or still being examined. Applications are listed by filing date, newest first.
History
- 29 Jan 2021ABN cancelledABR
We record changes every week from 20 Nov 2026. Earlier dates come from each register.
Related
Also in postcode 3141
- Melbourne Girls Grammar - an Anglican SchoolActivePublic company · VIC 3141 · ABN 81 116 806 163
- VITURA HEALTH LIMITEDActivePublic company · VIC 3141 · ABN 59 629 071 594
- ENTERTAINMENT ASSISTActivePublic company · VIC 3141 · ABN 17 134 855 511
- EVIDENT FOUNDATIONActivePublic company · VIC 3141 · ABN 81 152 078 487
- ROBIN BOYD FOUNDATIONActivePublic company · VIC 3141 · ABN 50 111 119 807
- SNOWDOME FOUNDATION LIMITEDActivePublic company · VIC 3141 · ABN 79 624 141 117
- 'TIL THE COWS COME HOME LTDActivePublic company · VIC 3141 · ABN 62 626 387 273
- SCANLAN AND THEODORE PTY. LTD.ActivePrivate company · VIC 3141 · ABN 64 006 782 609
- VILLAGE ROADSHOW PTY LTDActivePrivate company · VIC 3141 · ABN 43 010 672 054
- ENTERTAINMENT ASSIST (HPC) LIMITEDActivePublic company · VIC 3141 · ABN 83 609 638 182
Similar names (not necessarily related)
- PROJECT YOUTHActivePublic company · NSW 2228 · ABN 74 717 061 265
- PROJECT ETICO AUSTRALIA LIMITEDActivePublic company · NSW 2786 · ABN 84 625 054 079
- PROJECT INDEPENDENCE LTDActivePublic company · ACT 2600 · ABN 46 160 299 409
- PROJECT CO-ORDINATION (AUSTRALIA) PTY. LIMITEDExternal administrationPrivate company · ACT 2600 · ABN 26 008 566 005
- PROJECT FUTURES LtdActivePublic company · NSW 2000 · ABN 21 137 991 050
- PROJECT NOAH VIC LTDActivePublic company · VIC 3161 · ABN 21 699 874 836
- THE PROJECT ROCKIT FOUNDATION LTDActivePublic company · VIC 3067 · ABN 31 642 730 434
- THE PROJECT ROZANA FOUNDATION LTDActivePublic company · VIC 3006 · ABN 82 632 137 083
- PROJECT MEOW LTDActivePublic company · VIC 3216 · ABN 19 658 812 590
- PROJECT 7EVEN LTDActivePublic company · VIC 3127 · ABN 63 688 209 798