Skip to main content

SHARP INITIATIVES PTY LTD

ActiveABN active since 5 Apr 2023ASIC: Registered

Australian private company · Limited by shares · VIC 3143

ABN
72 660 155 386Active since 5 Apr 2023
ACN
660 155 386Registered 14 Jun 2022
GST
Not registered
Location
VIC 3143Main business location

Registration

Legal name
SHARP INITIATIVES PTY LTD
ABN
72 660 155 386 Active from 5 Apr 2023
ACN
660 155 386
Entity type
Australian Private Company
ASIC status
Registered
ASIC type
Australian proprietary company · Limited by shares · Proprietary company
Registered
14 Jun 2022
GST
Not registered
DGR
Not endorsed
Main business location
VIC 3143

Patents (15)

TitleStatusFiled
Innovative Methodology with two componentsUsing Perlite as filler/insulation material in load bearing Structural Insulation Panels SIPs instead of polyurethane so as to provide Type A Fire Protectionwhich enables the number of levels in a development to be greater than fourandUsing heavy duty hinges to solve manual handling problems caused by resultant heavier SIPs and enable rectangular layouts of 4 interconnected load bearing Perlite-filled SIPs to be swivelled into rhombus layouts to be transNo. 2026906780 · ProvisionalFiled3 Aug 2026
This Provisional Patent Application expands on the innovative methodology for multi-storey modular buildings which was the subject of six previous Provisional Patent Applications This particular Application extends that innovative methodology by using a more advanced design of hinge that is quicker to install and to remove than had previously been possible The overall application first enables a Modular Wall System to form the shape required for the System to be transported to site and then secoNo. 2026901265 · ProvisionalFiled16 Feb 2026
Solution to the potential loss of ground level car parking spaces on land upon which buildings are to be constructedNo. 2025906829 · ProvisionalFiled28 Dec 2025
No longer current (12)
TitleStatusFiled
As an extension to these five previous Provisional Patent Applications this particular submission extends the innovative methodology of using heavy-duty hinges to cause in this particular Application a Modular Permanent Wall Formwork System to form the shape that is required for that unit to be transported by road or rail and then on delivery how those same heavy-duty hinges cause the Modular Permanent Wall Formwork System to constitute the shape required for it to be installed on-siteNo. 2025903348 · ProvisionalLapsed31 Jul 202631 Jul 2025
Innovative Methodology to increase the number of floors allowed in Class 2 Buildings beyond 4 storeys and which are constructed using load-bearing Structural Insulated PanelsNo. 2025901312 · ProvisionalLapsed15 Apr 202615 Apr 2025
Innovative Methodology that uses a heavy-duty hinge product derived from the design of equivalent heavy-duty gate hinges as swivels to cause a Modular Structural Insulation Panel SIP System of at least 4 inter-connected Party Walls to form the shape that is required for that System to be transported by road or rail Then on delivery such heavy-duty hinges are used again to cause that Modular SIP System to constitute the shape required for it to be installed on-siteNo. 2024903977 · ProvisionalLapsed1 Dec 20251 Dec 2024
New Process for fitting the party walls of broad rectangular modular units onto drop-down trailers for transporting such units to site whilst complying with the width requirements of road transport regulationsNo. 2024903466 · ProvisionalLapsed25 Oct 202525 Oct 2024
Innovative methodology for transporting Modular Structural Insulated Panel System Units that would otherwise be greater than the width allowable to be carried by trailers on the roadsNo. 2024902499 · ProvisionalLapsed12 Aug 202512 Aug 2024
Supplement to methodology for transporting residential steel structured modular units that would otherwise be greater than the width allowable to be carried on roads or other modes of transportNo. 2024902266 · ProvisionalLapsed21 Jul 202521 Jul 2024
Methodology for transporting residential steel structured modular units that would otherwise be greater than the width allowable to be carried by trailers on the roadsNo. 2024901538 · ProvisionalLapsed24 May 202524 May 2024
Innovative Methodology allowing the introduction of at least one extra floor level for development of residential projects than was previously the caseNo. 2023902343 · ProvisionalLapsed6 Sep 202423 Jul 2023
A NEW PROCESS WHICH IS ADOPTED ON CONSTRUCTION PROJECTS THAT HAVE THE USE OF A TYPE OF CONCRETE MADE FROM LOW CARBON CEMENT AS A STIPULATION AND TO A PRE-DEFINED EXTENT THE NEW PROCESS IS AN INNOVATIVE METHODOLOGY THAT CONCLUSIVELY PROVES THAT THIS A TYPE OF CONCRETE IS INDEED BEING USED TO THE PRE-DEFINED EXTENT BY MEANS OF THE APPOINTMENT OF A SUITABLY QUALIFIED AND INDEPENDENT CONSULTANT UNDERTAKING A SCOPE OF WORK THAT ENCOMPASSES THE TESTING AND CERTIFICATION OF SUCH CONCRETE BY EMPLOYING PNo. 2023900786 · ProvisionalLapsed3 May 202421 Mar 2023
New Process used on multi-storey development projects for Town-Planning Applicants to install building elements that have reduced Embodied Carbon emissions in exchange for being granted at least one additional storey per project for such developments by the relevant Responsible AuthorityNo. 2023900204 · ProvisionalLapsed1 Mar 202430 Jan 2023
New Process used on multi-storey development projects for town planning Applicants to install Carbon Captured Cement Sheeting that reduces CO2 emissions in comparison with Fibre-Cement Sheeting or Plasterboard in exchange for being granted at least one extra storey per project by the relevant AuthoritiesNo. 2022903515 · ProvisionalLapsed5 Jan 202421 Nov 2022
New Process used on multi-storey development projects for town-planning Applicants to install cladding that reduces CO2 emissions in exchange for being granted at least one additional storey per project for such developments by the relevant AuthoritiesNo. 2022903024 · ProvisionalLapsed1 Dec 202314 Oct 2022

Current means registered, granted or still being examined. Applications are listed by filing date, newest first.

History

  1. 5 Apr 2023
    ABN activeABR
  2. 14 Jun 2022
    Registered with ASICASIC

We record changes every week from 20 Nov 2026. Earlier dates come from each register.

Related

Also in postcode 3143

All businesses in postcode 3143 →

Similar names (not necessarily related)